The 1st park contains a ability of 200 MW whilst Sandrini II includes a capacity of 100 MW. The whole price of the two jobs were not disclosed nevertheless, for the duration of construction, above two hundred staff have been used. The initiatives are predicted to check out A few https://justpaste.it/eo60k