1

Penmann finalises specialist HVAC installation for Nutricia’s Liverpool site in line with FSI Phase 1 and 2

News Discuss 
Penmann successfully delivered a tailored HVAC upgrade at Nutricia’s Liverpool facility, providing a bespoke ventilation and climate control system designed to satisfy stringent hygiene and production requirements. The scope included the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. https://trackbookmark.com/story22399432/the-penmann-team-finalises-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story