Project Highlight At a prominent confectionery site in York, Newsome has installed a high-capacity 400 kW chiller, marking the timely realisation of the project. This initiative demonstrates a notable step forward in the client’s ESG commitments, enhancing process stability and delivering measurable reductions in both energy consumption and carbon emissions. https://thefairlist.com/story10897811/high-efficiency-400-kw-chiller-installation-delivers-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving